Interior finishes are starting, brand new beautiful metal roof is leaking.

Our wood floors were installed last week and the tile people started this week.  The finish carpenter started Friday and will hopefully be working this week.  Because of the weather last week, we were lucky to find a roof leak.  Hopefully they can pinpoint it and fix it before we are ready for paint.  I think the spray foam is saving a lot of sheetrock, the only place the water is coming in is above the master bedroom doors.  I think the water is working its way down to the 1st available place without foam, which happens to be the header above the door.  Even though it is frusterating to have a leak in our brand new house, I guess I need to look on the bright side.  It could be worse. 