The rock is finished, the siding is starting to go on (no that isn't the color it is going to be) and the roofers started on the roof. Sorry no pics of the roof yet, maybe next week. As soon as the roof is finished we will start on the insulation and sheetrock, we were clear to insulate a couple of weeks ago, but I wanted to wait for the roof.
Sunday, February 1, 2009
Saturday, January 10, 2009
"You're knocking THIS house down?"
Just about every contractor that comes in to my current home asks me "You are knocking this down?" in a way that I think that they think I am crazy. Like what they really want to say is "you have a really nice house now, why do you need a new one you crazy person that obviously must have too much money and doesn't know how to spend it correctly?" So I decided that I needed to give you a top 10 things that I am looking forward to in my new house.
1. Heat. My current home was built in 1940 with an addition somewhere in the 1980s. The original part of the house has no insulation on the outer walls. They are brick with plaster and lath as a inside finish on top of the brick. The addition probably has insulation in the walls, but with the vaulted ceilings and the way that they added on the vents, the temperature is always 10 degrees different than the other part of the house. In the winter it is colder than the old part of the house and in the summer it is hotter. When it gets really cold the furnace can't quite keep up. The temperature in the old part of the house where the thermostat is located is currently 62 degrees. It will get as high as 68 degrees when the sun is up, but that is as high as it will get. I know that other people leave their heat at 68-69 all winter and think that is a perfectly adequate temperature, but I am cold!
2. And speaking of cold, my kitchen floor is freezing. I don't know why. It is tile, which I know is colder than other flooring, but this is the coldest tile floor I have ever had. The new house will have wood floors in the kitchen and I have very high hopes that I will never have to step on a cold kitchen floor again.
3. Lights that work the way they are supposed to. The light in my kitchen has a short. Sometimes when you turn it on, it turns back off, so you have to go turn it on again. The light in my bedroom won't turn on unless the switch on the other side of the room is off. The switch on the other side of the room doesn't turn anything on, it just won't let the other switch turn on the light. The light to the guest bathroom is right outside the bathroom. Guests have a hard time finding it. And the little annoying old house things like having to go all the way across the room to turn on the light for that room. I know these are all minor annoyances, but it will be nice not to deal with them in the new house.
4. Hot water. It takes about 5 minutes to get hot water to any faucet in the house. Theoretically 1 of them should be close enough to the water heater to be a little faster, but no. 5 minutes minimum at any faucet.
5. Soft water. There just isn't a good way to implement it in the old house.
6. An oven that stays on. My current oven preheats and then turns off. About 5-10 mintues after it turns off you can turn it back on again. Sometimes when it is back on again it will stay that way and sometimes it will turn off again. It makes Thanksgiving more fun, guessing whether or not the turkey will be done and I have to tell you they say to bake cookies at 350 for a reason. They aren't quite the same when the oven temperature starts dropping.
7. I had some clients that were looking for a house and all they wanted was a 2 bum kitchen. They wanted a kitchen that they could both be in at the same time without running into each other all the time. My current kitchen is definatly a one bum kitchen. The new one is at least 4, maybe 5.
8. An enclosed back yard for the dog and the kids. Our garage was behind our current house and we had a guest house behind that. By moving it to the front, we are gaining a back yard that I can let the girls go out in without worrying about them being out of sight or being run over by someone coming up the driveway.
9. Windows that open. Some of the windows in the old house are original. They don't open. Some of them are relatively new casements with cranks that are broken. They don't open. I like fresh air every once in a while, so I am looking forward to windows that work the way they are supposed to.
10. And finally, my home office is going to have a door. I don't think there is any need to explain this one.
We did look into just remodeling the old house to get a little more room and fix the problems, but it was going to cost as much as building new and would still have some of the old house "charm". Another plus of moving back a little in the lot is that the trees in the front of the house will have more room to grow.
But all of this is just a little too much to explain to every contractor that walks in so I just smile and say "Yes we are."
Thursday, January 1, 2009
Chimney or no Chimney??
Wednesday, December 31, 2008
Windows for Christmas
Our windows came just in time for Christmas. They are aluminum clad exteriors with wood interiors made by Sierra Pacific. We got push out casement windows, which means they are casement windows that don't have the cranks at the bottom (we have those kind now and don't like them because the cranks break). To open the window you just have to unlock two locks and push.
Unfortunately now that they are installed, I think the kitchen window's 2nd lock is too high for me to reach, so I will have to get Sal if I want it open.
Unfortunately now that they are installed, I think the kitchen window's 2nd lock is too high for me to reach, so I will have to get Sal if I want it open.
Dining Room
Sunday, December 21, 2008
Can someone stop the snow???
The weather has officially turned, and not in a good way. We waited to order our windows until we had framed all the openings just to be sure that they would be right. They thought it would take 4 weeks to get them here, but "we didn't want to fire anyone, but business has slowed down so everyone is working less" means that we are getting windows on Monday. 2 weeks ago would have been better, but I guess you go with what you've got.
Meanwhile, the HVAC guys that thought they would be done in 2 weeks are still not done. I think the plumbers are done and we are just getting started on electrical. I had hoped to insulate before the end of the year and maybe be able to install cabinets at the end of January. That isn't going to happen. :(
It is too cold to go and take pictures inside the house for the blog so I took this picture from my bedroom window.

Meanwhile, the HVAC guys that thought they would be done in 2 weeks are still not done. I think the plumbers are done and we are just getting started on electrical. I had hoped to insulate before the end of the year and maybe be able to install cabinets at the end of January. That isn't going to happen. :(
It is too cold to go and take pictures inside the house for the blog so I took this picture from my bedroom window.
Sunday, November 16, 2008
2nd Floor
It is starting to look like a house! I think the framers still have at least one more week of work, maybe 2. It is a lot taller than we thought it would be. I am sure that when everything else is finished it won't feel so tall, but right now it is a little shocking. We ordered windows last week, but they won't be here until mid December, so I am hoping for no more precipitation until they get here!
Exterior 2nd floor walls
Sunday, November 2, 2008
Framing at last
The construction loan finally closed last month!! Who knew that would be so hard. Maybe I should have consulted a professional?
After a window well saga, that I will tell you about later, we finally got to see the framing get started about 2 weeks ago. The framers have been here basically every day. The basement is framed, the first floor is mostly done and the 2nd floor is started. I am hoping that the roof goes on by next week, but the weather is starting to turn, so we will see how it goes.
After a window well saga, that I will tell you about later, we finally got to see the framing get started about 2 weeks ago. The framers have been here basically every day. The basement is framed, the first floor is mostly done and the 2nd floor is started. I am hoping that the roof goes on by next week, but the weather is starting to turn, so we will see how it goes.
1st wall in the basement